Our Completed Projects
Engineers, technicians, site managers and field experts work together to guarantee the quality and performance of each project.

Project to strengthen drinking water supply systems (SAEP) in the Mono and Couffo departments: Site visit for the construction of a pumping station on Azovè

Pump immersion work on the Hevié village water supply system

Project to install 19 SAEPmVs: immersion of pumps, installation of chlorination tanks plus dosing pumps and agitator, installation and connection of a generator set plus control cabinet at the Pahou site

Flow rate measurement at the wellhead

Project to bring the electrical installations of the Loko building into compliance: Construction work (in the workshop) and installation of 12 distribution boards (TD) within the José Dominique Loko Foundation building

Installation of solar streetlights at the KPANROU pumping station

Lightning risk assessment studies and installation of a Prevectron 3 type lightning rod on a 5-story building in downtown Cotonou (Ganhi)

Construction work on 19 village water supply systems (19 SAEPmV) in the departments of Atlantique, Ouémé and Plateau: Immersion of pumps at the Itadjebou site

Construction of a 30m3 water tower with a 9m height under the tank in the municipality of Toucountounan (AEV of Tampégré)

Construction of a 350m3 water tower with a height of 16m under the tank in the commune of Kalalé as part of the multi-village drinking water supply system (SAEPmV of Nacicomzi)